1 . Project Control Analyst:

Reporting to the Project Controls Lead, the Project Controls Analyst is
responsible for ensuring quality and accurate cost, progress and
performance information is delivered for project control purposes relating to
the construction of the Extraction Major Projects.
Specific accountabilities include (but are not limited to):
- Assist in the preparation, consolidation and analysis of cost reports, reconciliations and cost forecasts.
- Interpret engineering and contractor cost reports and forecasts for Management.
- Compare actual with planned and forecast costs and explaining variances
- Support the Cost Specialist to achieve daily and monthly deliverables.
- Maintain expense accounts, forecasts of costs, quantities and hours, camp reports, and audit contractor invoices.
- Assemble and maintain data for contractor reporting.
- Revise and update data, check documentation, reports and provide support for month end reporting.
- Maintain cost and appropriation files for projects and contractors.
- Ensure effective project control using project control tools, team effort and being cost conscious.

2 . Estimators

Responsible for the preparation of conceptual and detailed estimates based on

an understanding of engineering documentation, specification and

drawings as well as construction, risk evaluation and material take-off

techniques. Senior Estimators (5-10 years experience) with Icarus (IPM

and/or Kbase) knowledge are preferred. Oil sands experience is a significant asset.

3. Project Control Lead :

The Project Controls Lead is accountable to develop, maintain and
continuously improve all aspects of Project Controls relating to major
projects.

The Project Controls Manager will contribute to the timely and cost
effective implementation of capital and expense projects in the Major
Projects Group.

Specific accountabilities include (but are not limited to):
Assist in the development of a fluid cohesive team and culture strong relationship with other groups such as the EP contractor, contract resources and other stakeholders.
Ensure that the construction management team and construction contractors adhere to the project controls standards and procedures as outlined by the PMO
Develop and/or revise as needed, project control standards and procedures specific to the execution of construction related activities.
Direct all staff and contractors to ensure the project is executed through a well defined and formalized field change management process to ensure that the project is designed and constructed as per applicable Suncor standards.
Schedule and implement various risk assessment techniques as required as the project passes certain milestones or gates to ascertain the external view of risk with respect to cost and schedule and other externalfactors.
Final acceptance of the AFE cost estimate through to the final TIC at project completion inclusive of the final input to the project closeout report.
Focus on accurate and timely cash flow management and respond to the requirements of corporate management.
Experience and Education Requirements

Minimum education will include Engineering/Construction Technology Studies or equivalent related courses and experience.
15 years engineering/construction experience (large projects, preferably mineral processing, oil & gas or process plants) which includes a minimum of 8 years in a supervisory capacity.
A self-starter, able to work with minimal supervision and assistance.
Strong organizational and leadership skills and an excellent
communicator (both written and verbal).
Strong analytical, interpretive and independent problem solving skills
combined with excellent computer skills (MS Office).

4. Project Planners:

10+ years of experience in projects. Should have experience in planning and be able to visualize and plan projects, risk management etc.


Thanks,

Best Regards,

Sushil Rana B Eng, PMP

Practice Leader
Da Vind 'The Finders'
Value Added Recruitment Practices
Suite 1150, Manulife Place, 10180 - 101 Street,
Edmonton, Alberta T5J 3S4
Phone: 780 628 2066 (office) 780 994 7262 (cell)
Fax: 780 628 2080
Email: sushil.rana@davind.com
Website: www.davind.com
shift operator 当前离线  
回复时引用此帖
旧 Sep 9th, 2005, 13:33     #2
shift operator
Senior Member
级别:5 | 在线时长:51小时 | 升级还需:9小时
 
shift operator 的头像
 
注册日期: Jul 2004
帖子: 336
声望: 231
shift operator has a spectacular aura aboutshift operator has a spectacular aura aboutshift operator has a spectacular aura about
Talking

也不知道中介公司在哪弄到我的简历,打电话问我是否有兴趣,不过我很高兴我现在的工作。看来是工作在找人。按照中介发给我的EMAIL,如果有人得到OFFER,别忘了我应有 $500 BONUS .

If you refer any friend of yours for the positions, there is a referral bonus of $500 per person if the person is employed.
shift operator 当前离线  
回复时引用此帖
旧 Sep 22nd, 2005, 18:47     #3
shift operator
Senior Member
级别:5 | 在线时长:51小时 | 升级还需:9小时
 
shift operator 的头像
 
注册日期: Jul 2004
帖子: 336
声望: 231
shift operator has a spectacular aura aboutshift operator has a spectacular aura aboutshift operator has a spectacular aura about
默认

引用:
作者: seedling
请问 shift engineer 是在做power engineer 的工作么? 那里类似的工作机会多么? 本人有电厂运行维护和安装的经验。

POWER ENGINEER 实际是中国的电厂倒班工人,在加拿大发电厂工作的叫POWER ENGINEER,在化工厂或炼油厂叫PROCESS OPERATOR。
shift operator 当前离线  
回复时引用此帖
旧 Sep 22nd, 2005, 21:42     #4
shift operator
Senior Member
级别:5 | 在线时长:51小时 | 升级还需:9小时
 
shift operator 的头像
 
注册日期: Jul 2004
帖子: 336
声望: 231
shift operator has a spectacular aura aboutshift operator has a spectacular aura aboutshift operator has a spectacular aura about
默认

引用:
作者: seedling
爱城工作机会多么?(相对来说)
谢谢!
cncalxriver@yahoo.ca
我不知道你相对哪来说,如果网上查,安省多一些,安省叫STATIONARY ENGINEER,SAME AS POWER ENGINEER IN ALBERTA。还有一个地方,FORT MCMURRAY,ALBERTA,缺POWER ENGINEER,但是冬天特艰苦,-44 度。
shift operator 当前离线  
回复时引用此帖
发表新主题 回复


发帖规则
不可以发表新主题
不可以发表回复
不可以上传附件
不可以编辑自己的帖子

启用 BB 代码
论坛启用 表情符号
论坛启用 [IMG] 代码
论坛禁用 HTML 代码



所有时间均为格林尼治时间 -4。现在的时间是 11:23

请尊重文章原创者,转帖请注明来源及原作者。
凡是本站用户自行发布的任何信息,皆不代表本站的立场,
华枫网站不确保各类信息的正确性和可靠性,也不承担由此而导致的任何直接或间接损失以及任何法律责任。

Copyright © 1999-2024 Chinasmile